Testing
TESTING
All equipment is routinely tested to BSEN 61439 prior to dispatch from our works. This would generally involve the following standard tests:
1000V Insulation Test.
2.5kV Pressure Test.
Continuity Test.
Functional Tests for Instruments and Controls.
Where multi-section cubicles are re-assembled on site, we would carry out repeat tests as necessary. If required, more sophisticated tests may be performed to your specification, and this should be requested at time of order.
Ranging from simple Insulation or Ductor tests to comprehensive proving of protection systems; we are able to support installation of new equipment; fault find, or verify fidelity of existing equipment.
LV Switchgear
Design & Manufacture of Bespoke Built Low Voltage Switchgear & Control Switch Panels.
Site Services
Surveying of complete installations, Load monitoring, Equipment condition reports, Engineering support and more.
Testing
1000V Insulation Test, 2.5kV Pressure Test, Continuity Test, Functional Tests for Instruments and Controls.
Installation
Utilising our experience in a range of mechanical handling and lifting practices.